Kaohsiung Luyuan
Location
20MW/33MWh
Capacity
Frequency Regulation, Energy Shifting
Application
The first Taipower self-built energy storage project
In 2021, Recharge Power won the bid for the "Luyuan Primary Distribution Substation (D/S) Energy Storage Equipment System " procurement project and installed it at Taipower Luyuan Substation. This project uses the world's fourth largest Powin Energy energy storage system.
The Luyuan project completed the COD as scheduled in January 2022, becoming Taipower's first self-built BESS project to go online. This achievement not only demonstrates Recharge Power's outstanding planning and design capabilities, but also highlights its project management level fully meets Taipower's strict requirements.

Luyuan Project

Our Project
Zhongli Project

Taoyuan Zhongli
Location
2MW/3MWh
Capacity
Frequency Regulation, Voltage Control
Application
The first Taipower AFC service procurement
Recharge Power won the bid for Taipower's "Energy Storage Automatic Frequency Control (AFC) Frequency Modulation Backup Service" procurement project in 2020, and was officially launched on May 21, 2021. It is the first grid-level frequency control energy storage project in Taiwan. This project uses the world's fourth largest Powin Energy energy storage system.
The project has been running well so far. As of July 31, 2024, the average execution rate is 99.96%, far higher than Taipower's highest execution rate standard of 95%.
Luyuan Project

Kaohsiung Luyuan
Location
20MW/33MWh
Capacity
Frequency Regulation, Energy Shifting
Application
The first Taipower self-built energy storage project
In 2021, Recharge Power won the bid for the "Luyuan Primary Distribution Substation (D/S) Energy Storage Equipment System 1 Set" procurement project and installed it at Taipower Luyuan Substation. This project uses the world's fourth largest Powin Energy energy storage system.
The Luyuan project completed the industrial and commercial transfer as scheduled in January 2013, becoming Taipower's first self-built project to go online. This achievement not only demonstrates Recharge Power's outstanding planning and design capabilities, but also highlights that its project management level fully meets Taipower's strict requirements.
Beimen Project

Tainan Beimen
Location
6.2MW/22.35MWh
Capacity
Energy Shifting
Application
Taiwan's first PV+BESS project
In November 2022, Recharge Power won the bid for the first "PV+BESS" of the Energy Administration of the Ministry of Economic Affairs, and built it in the largest fishery and power symbiosis area in Beimen District, Tainan.
This project was completed and put into operation in February 2024. It is not only the first commercial optical storage project in Taiwan, but also the only one among the first batch of winning bidders that was completed and put into operation on time within the deadline, which once again proves the project management capabilities of Recharge Power.
Yilan Project ➀

Yilan Lize
Location
100MW/ 215MWh
Capacity
Frequency Regulation, Energy Shifting
Application
One of the largest private energy storage projects
It is one of the largest privately built projects in Taiwan and was completed and put into operation in June 2024. This project is located in a potential area for soil liquefaction. Recharge Power worked closely with structural technicians and civil engineers to plan and design geological improvements so that the civil engineering foundation of the Yilan project meets the equipment load-bearing requirements.
The energy storage system of Wartsila, one of the world's top three energy storage system manufacturers, is adopted. In addition to dReg and E-dReg, this project also has control applications such as real-time backup and voltage control.
This project was also investigated by UL under the Equator Principles. According to the environmental and social sustainability performance evaluation defined in the Equator Principles, UL believes that this project has no adverse impact on the environment and society, which can prove the environmentally friendly site construction concept of Topway.
Yilan Project ②

Yilan Lize
Location
100MW/120MWh
Capacity
Frequency Regulation, Energy Shifting
Application
One of the largest private energy storage projects
It is one of the largest privately built projects in Taiwan and is expected to be launched in September this year. The project site is located in a potential area for soil liquefaction. Recharge Power worked closely with structural technicians and civil engineers to plan and design geological improvements so that the civil engineering foundation of the Yilan project meets the equipment load-bearing requirements.
The energy storage system is made by Fluence, one of the world's top three energy storage system manufacturers. In addition to dReg and E-dReg, this project also has control applications such as real-time backup and voltage control.
This project was investigated by UL under the Equator Principles. According to the environmental and social sustainability performance evaluation defined in the Equator Principles, UL believes that this project has no adverse impact on the environment and society, which can prove the environmentally friendly site construction concept of Topway.
Guanyin Project ➀

Taoyuan Guanyin
Location
4.6MW/6.4MWh
Capacity
Frequency Regulation
Application
Recharge Power's first private construction project
Officially in operation since 2022, Recharge Power has continuously provided professional operation, maintenance, and warranty services to our clients.
Guanyin Project ②

Taoyuan Guanyin
Location
4.5MW/9.6MWh
Capacity
Frequency Regulation
Application
Civilian Energy Storage Project
Officially in operation since 2023, Recharge Power has continued to provide professional operation, maintenance, and warranty services to our clients, as well as aggregator service.

Beimen Project
Tainan Beimen
Location
6.2MW/22.35MWh
Capacity
Energy Shifting
Application
Taiwan's first PV+BESS project
In November 2022, Recharge Power won the bid for the first "PV+BESS" of the Energy Administration and built it in the largest fishery and electricity symbiosis area in Beimen District, Tainan.
This project was completed and put into operation in February 2024. It is not only the first commercial PV+BESS project in Taiwan, but also the only one among the first batch of winning bidders that was completed and put into operation on time, which once again proves the project management capabilities of Recharge Power.
Yilan Lize
Location
100MW/ 215MWh
Capacity
Frequency Regulation, Energy Shifting
Application
One of the largest private energy storage projects
It is one of the largest privately built projects in Taiwan and was completed and put into operation in June 2024. This project is located in an area for potential soil liquefaction. Recharge Power worked closely with structural technicians and civil engineers to plan and design geological improvements so that the civil engineering foundation of the Yilan project meets the equipment load-bearing requirements.
The energy storage system of Wartsila, one of the world's top three energy storage system manufacturers, is adopted. In addition to dReg and E-dReg, this project also has control applications such as real-time backup and voltage control.
This project was also investigated by UL under the Equator Principles. According to the environmental and social sustainability performance evaluation defined in the Equator Principles, UL believes that this project has no adverse impact on the environment and society, which can prove the environmentally friendly site construction concept of Recharge Power.
Yilan Project ➀

Yilan Project ②

Yilan Lize
Location
100MW/120MWh
Capacity
Frequency Regulation, Energy Shifting
Application
One of the largest private energy storage projects
It is one of the largest privately built projects in Taiwan and is expected to be launched in September this year. The project site is located in an area for potential soil liquefaction. Recharge Power worked closely with structural technicians and civil engineers to plan and design geological improvements so that the civil engineering foundation of the Yilan project meets the equipment load-bearing requirements.
The energy storage system is made by Fluence, one of the world's top three energy storage system manufacturers. In addition to dReg and E-dReg, this project also has control applications such as real-time backup and voltage control.
This project was investigated by UL under the Equator Principles. According to the environmental and social sustainability performance evaluation defined in the Equator Principles, UL believes that this project has no adverse impact on the environment and society, which can prove the environmentally friendly site construction concept of Recharge Power.

Guanyin Project ②
Taoyuan Guanyin
Location
4.5MW/9.6MWh
Capacity
Frequency Regulation
Application
Civilian Energy Storage Project
Officially in operation since 2023, Recharge Power has continued to provide professional operation, maintenance, and warranty services to our clients, as well as qualified trader management services."
Taoyuan Guanyin
Location
4.6MW/6.4MWh
Capacity
Frequency Regulation
Application
Recharge Power's first private construction project
Officially in operation since 2022, Recharge Power has continuously provided professional operation, maintenance, and warranty services to our client.

Guanyin Project ➀

Zhongli Project
Taoyuan Zhongli
Location
2MW/3MWh
Capacity
Frequency Regulation, Voltage Control
Application
The first Taipower AFC service procurement
Recharge Power won the bid for Taipower's "Energy Storage Automatic Frequency Control (AFC) Frequency Modulation Backup Service" procurement project in 2020, and was officially launched on May 21, 2021. It is the first grid-level frequency control energy storage project in Taiwan. This project uses the world's fourth largest Powin Energy energy storage system.
The project has been running well so far. As of July 31, 2024, the average execution rate is 99.96%, far higher than Taipower's highest execution rate standard of 95%.